Lied Bridge Progress

Lied Bridge Progress

April 27, 2021

The Lied Platte River Bridge is open at the South Bend end and trail users may venture onto the bridge for the first time since severe flooding closed the trail bridge in March of 2019.  The bridge, however, is barricaded closed at the Papio-Missouri River NRD end.  Reconstruction of the trail leading onto the bridge is underway and the Papio NRD hopes to open the trail in early July.