| Water
Well Construction Permit- (Link is temporarily inactive due to recent changes. Try again in a few days or contact the NRD) a permit is required for anyone
constructing a well in a ground water management area unless the well
is a single water well designed and constructed to pump 50 gallons
per minute or less. A $50.00 filing fee payable to the "Lower
Platte South NRD" should accompany the application. |
| Chemigation
Permit-Chemigation is the applicaion of chemicals to a crop
through an irrigation system. The procedure requires a state permit
to be submitted annually to the NRD by June first. The NRD then conducts
inspections of newly permitted equipment once every three years following
the initial inspection. |
NOI/NPDES
Permit-Under City of Lincoln ordinances, any development of
land on a site one acre or larger requires submission of this form
by the developer or their consultant to the NRD for approval. It must
be accompanied by a Stormwater Pollution Prevention Plan (SWPPP).
Stormwater
Pollution Prevention Plan Guidelines |
 |